Builder Name:Jeff Seaborn   -  
Project:   Dalotel DM165   -   VIEW REPORTS
Total Hours:653
Total Flight Time:
Start/Last Date:Nov 06, 2019 - Nov 06, 2019
Engine:Originally Continental IO-346 A what? Yep, an IO-346 as used in Muskateers of the same vintage
Propeller:A Regy Wooden Fixed Pitch What the heck is that? A French prop from that era
Panel:Steam gauges circa 1969. In French and in metric. Yikes!
 
Friendly URL: https://eaabuilderslog.org?s=jseaborn

Home or Last Project Picture

Mar 17, 2021     Aileron Control Assembly - (2.5 hours)       Category: Fuselage
Was able to fabricate a tool to allow removal of the collar. This allowed removal of the aluminum cage, which in turn, allowed removal of the control tube.

With the parts removed from the fuselage, I was able to give them a lacquer thinner bath and a gentle scrubbing to clean off all the grease, dirt, and grime. As always, the parts underneath the dirt are beautiful pieces of work. Some of the steel pieces had some light surface rust. Gave them a bath in a rust remover and then a full cleaning and surface prep. Scrubbed the control tube and repainted it. Cleaned and re-greased all the bearings and reinstalled them into the cage.

Temporarily installed the freshly cleaned and lubed torque linkages to the control tube. Discovered that the custom bolts that connect the torque linkages to the control tube are very slightly different sized, by 0.009 of an inch. This difference establishes an upper and a lower bolt, and it establishes a left and a right hand torque linkage by their corresponding mounting holes. Well done Dalotel.


 